The Kayseri-Ovacık Wind Energy Power Plant Project BOP Works started in July 2024. The capacity of the Wind Power Plant is 15 MW (3x6 MW GW 165-6.0 MW). Dere Construction is started (as the EPC Contractor) the full scope of main contracting works including; permits, foundation Works energy transmission line Works, turbine installation and commissioning.
The TPI Bergama Wind Energy Power Plant Project started commercial operation in August 2024. Dere Construction have signed a contract with TPI for the Wind Power Plant project within the scope of the 5.1.h regulation. The capacity of the Wind Power Plant Project is 11.8 MW (2x5.9 MW NX-N149). Dere Construction has completed (as the EPC Contractor) the full scope of main contracting works including; permits, foundation Works energy transmission line Works, turbine installation and commissioning.
İpektepe WEPP is located in Ağrı. The installed capacity of the power plant is 24MW. The wind farm consists of 5 turbines, each of them with a capacity of 4.8 MW. Dere Construction has led (as the EPC Contractor) the full scope of main contracting works including; tower foundation, platforms, connection roads, inner wind farm electric works, transformer, substations, high voltage transmission line and all the turbine erection works.
The project located in Turgutlu, Manisa with a 232.000 m2 plot area is going to contain 150 commercial / industrial units of different sizes for mid-scale industrial production companies. The construction works include Piling, Retaining Walls, Geogrid Retaining Wall, Pre-cast Building, MEP Works, Roof and Facade Cladding Works, Infrastructure Works etc…
In order to serve you better on our site, we place cookies on our site. As long as you visit our site, you accept our Clarification Text on the Protection of Cookies and Personal Data. Close X